The contract started February 2021 Plumbing: Kitchen taps:As left after building works: > waste not connected under the sink (so water flows onto the ground);> hot supply to kitchen tap…
Well, the three radiators that Seamus plumbed in, the small one in the hall remains totally cold after a professional boiler installation. The 1600 x 300 one in the livingroom…
The kitchen was second hand so understandable that it was not ideal to fit. One of the worktop plinths stopped between and not on a cabinet side panel, so that…
This week (ending 19 April 2024), the electrician has come back to finish the work and certification, following the boiler installer who came back to do the boiler pipework properly…
I went on the roof with the Velux kits yesterday to finally understand what had been installed, what was missing, and how to fix it from the kit I purchased…
Clearly the emails below show my struggles with the plumbing and other matters after the builders above left the job incomplete, with no apology or compensation paid. The current plumbing…
The plumbing was not finished and it's difficult to work out. The contract specified first and second fix plumbing. But unterminated pipes were left abandoned all over the place. I…
I was asked for a "wee list" of what remained to be done at the house. First and foremost, electrical completion and certification. Then the plumbing - cold water, hot…